Your whole bill is built on one number — the reading on your meter. When the meter itself goes wrong, the bill goes wrong with it. The good news: a faulty meter is MEPCO's problem to fix, and the process is straightforward once you know the steps.
Signs your meter is faulty
Most people only suspect the meter when a bill looks wrong. Act on these signs:
- The meter has stopped. The reading does not change for days even though you are using electricity normally.
- The display is blank or flickering. On a digital meter the screen shows nothing, or flashes on and off.
- The meter runs with everything switched off. The reading keeps climbing even when the whole house is disconnected — this is the clearest sign of a fault.
- The bill jumps for no reason. Units shoot up sharply while your appliances and habits have not changed. High usage is usually an appliance or a habit, not the meter — check the electricity saving tips first — but a sudden, unexplained jump is worth testing.
- Burning smell, sparking or a scorched meter. This is an emergency, not a routine fault — see the safety steps below before anything else.
Safety first: a burnt or sparking meter
If your meter is smoking, sparking, smelling of melting plastic, or showing any sign of burning, do not touch it and do not pour water on it. Switch off your indoor main breaker, move away from the meter, and call the MEPCO helpline on 118 right away. A burnt meter is replaced through the same process below — but safety comes before paperwork, so report it by phone first, then follow up in writing.
Never open the meter yourself, never try to repair it, and never remove or break a seal. Only MEPCO staff may open or replace a meter — opening it yourself can be treated as tampering, which can turn a free replacement into a charged one.
Confirm the fault before you apply
Gather a little evidence first — the office can then see the problem instead of taking your word for it:
- Do the breaker test. Switch off your main breaker so the whole house is disconnected, then watch the meter for a few minutes. If it still advances, note the reading and take a dated photo — that is your proof. If it stops, something inside the house is drawing power: switch circuits back on one by one to find it. Our meter reading guide explains this test in detail.
- Photograph the meter. Take clear, dated photos of the display, the meter number and the seals. If the display is blank, photograph that too — a blank screen is itself evidence.
- Compare with your bill. Note the reading printed on your latest bill and compare it with what the meter shows today. If the bill's reading is already higher than the meter's, the reading was very likely misrecorded — say so in your application.
Keep the photos until at least two bills after the replacement have been checked.
How to apply for meter testing or replacement
There are three ways to start the process. Pick the easiest for you, and always collect a diary or tracking number so you can follow up.
Option 1: The MEPCO SMART app
The official MEPCO SMART app includes a meter change request option. Keep your 14-digit reference number ready, submit the request, and save the tracking ID it gives you. If you have not used the app before, our MEPCO SMART app guide walks through it.
Option 2: Your sub-division office (the most reliable route)
Visit the sub-division office named on your bill and submit a short written application asking for meter testing or replacement, with a copy of your latest bill, a copy of your CNIC, and the photos of the faulty meter. Ask for a stamped receiving or diary number — without it, you have no proof you applied and nothing to quote when you follow up.
Option 3: Helpline 118 or CCMS
Call 118 or 0800-63726, or register a metering complaint through the CCMS online complaint system, and ask for the meter to be tested or replaced. Keep the complaint or tracking number. This route is best for reporting the problem and for a burnt meter; a written application at the office is still worth doing if the complaint does not move. The full channels are in our complaint guide.
| What to take or keep ready | Why it matters |
|---|---|
| 14-digit reference number | Identifies your connection — every route asks for it |
| Copy of the latest bill | Shows your connection details and the last recorded reading |
| Copy of your CNIC | Proves you are the registered consumer |
| Dated photos of the meter | Evidence of the fault — blank display, stopped reading, damage |
| Diary / complaint number | Your proof of application and your reference for follow-ups |
Who pays for the replacement?
This is the question most people worry about, and the answer depends on why the meter failed. A meter that stops, runs wrong or burns out on its own — through no fault of yours — is generally MEPCO's responsibility to replace, because the meter belongs to the company, not to you. But if the damage was caused by overloading beyond your sanctioned load, or by tampering with the meter, the cost can be charged to you. That is another reason never to open the meter yourself, and never to run a load far above what your connection is sanctioned for.
Ask in writing whether any cost applies in your case before the work is done. If MEPCO issues a demand notice for a replacement charge, pay only through the channel named on it and keep the receipt. Never pay cash to an individual for a meter replacement.
How meter testing works, and how long replacement takes
After your application, MEPCO inspects the meter to confirm whether it is defective. The usual method is a check meter: a second, tested meter is installed alongside yours for a test period, and the two are compared over the same consumption. If your meter is found defective, the bills for the affected period can be revised, and the meter is replaced or repaired.
Under NEPRA's Consumer Service Manual, a defective meter should be replaced immediately — or within two billing cycles if a replacement meter is not available. Testing takes longer than a simple reading correction, because the check meter has to run alongside yours for a full test period. If two billing cycles pass with no replacement and no explanation, escalate with your diary or complaint number through the complaint channels.
On the day of the replacement
When the team arrives, five minutes of care can prevent months of billing arguments:
- Photograph the old meter showing its final reading and meter number, before it is removed.
- Photograph the new meter showing its starting reading and meter number, after it is installed.
- Check the seals on the new meter and note them in your photos.
- Ask the staff to record both readings on the meter change form, and request a copy if possible — then keep all photos until two bills after the change have been checked and matched.
Check the first bill after the replacement
The first bill after a meter change usually has two parts: the final units of the old meter and the starting units of the new one. Check both against your photos, then work out the units with one subtraction — current reading minus previous reading — as the meter reading guide shows, and estimate the amount with the bill calculator.
If the first bill after replacement looks wrong, do not just pay it. Follow the wrong bill correction route before the due date, with your photos and the meter change form as evidence — that is exactly what they are for. And if the amount is right but larger than you can pay at once, the bill installments guide explains how to split it.